Guelph, ON

Project

From Demo to Full-scale Operation

COMMISSIONED

2004

WWTP RATING

16.9 MGD (64,000 m3 / day)

POPULATION SERVED

140,000

LYSTEK THP MODULE SIZE

2 x LY6 (1.2 dry tons / hr)

LYSTEK THP PROCESSING FOOTPRINT

800 ft2 (74 m2)

FEEDSTOCK

Municipal biosolids (anaerobically digested)

ABOUT THIS PROJECT

In 2002, the City of Guelph entered into an agreement with Lystek to implement a demonstration project at its wastewater treatment plant. Lystek THP was piloted at full-scale at the Guelph WWTP in 2004. The demonstration project successfully met and exceeded all of the objectives specified in the agreement, and as a result a second Module was installed to increase processing capacity on site.

The City took ownership of the system and began commercial operations in 2008.

CATEGORY

In-Plant Installations